Valga’s Wire Rope Way

Valga’s Wire Rope Way

In 1927, the company “Novo y Sierra y Cía.” built a modern Bleichert’s wire rope way system for transporting materials between the Mercedes Mine, its brick factory and the As Caneiras river dock, on the Ulla River.